Fit-out · MEP · Civil · Healthcare · Abu Dhabi, UAE
Spaces built to the highest standard of care
Healthcare Fit-Out
Hospitals, clinics and laboratories
Operating theatres, clean rooms, patient rooms and VIP suites, robotic pharmacies, dialysis units and dental clinics — planned, built, tested and handed over licensing-ready inside live hospitals.
- 20+ pharmacy clean rooms · 15+ operating theatres
- ICRA phasing inside operating hospitals
- DoH, DHA and MOHAP approvals
Commercial & Hospitality Fit-Out
Hotels, offices, halls, schools, outdoors
Hotels and restaurants, offices, wedding halls and majlis, schools, landscaping and car shades — with the aluminium and glass works and the custom-made or imported furniture that complete them.
- Own aluminium, glass and joinery workshops
- Full engineering department: HSE, design, estimation, procurement
- In-house aftercare after handover
KRM Global at a glance
What is KRM Global Contracting & Maintenance?
KRM Global Contracting & Maintenance LLC is an Abu Dhabi fit-out, MEP and civil contractor established in July 2020 with two divisions. The Healthcare Fit-Out Department builds operating theatres, clean rooms, patient rooms, pharmacies, dialysis units and dental clinics. The Commercial & Hospitality Fit-Out division delivers hotels, restaurants, offices, wedding halls, schools, landscaping and car shades, with aluminium and glass works and furniture from KRM’s own workshops. A full engineering department — HSE, design, estimation, procurement, planning and QA/QC — monitors every project, and an in-house team maintains it after handover. ISO 9001, 14001 and 45001 certified.
- Legal name
- KRM Global Contracting & Maintenance LLC
- Founded
- July 2020, Abu Dhabi
- Divisions
- Healthcare Fit-Out · Commercial & Hospitality Fit-Out
- Engineering
- HSE, design, estimation, procurement, planning, QA/QC
- Workshops
- Joinery · Aluminium & glass · Stainless steel
- Certification
- ISO 9001:2015 · ISO 14001:2015 · ISO 45001:2018
- Trade licence
- CN-3696043
- Leader
- Rami Attaallah, CEO and biomedical engineer

Our mark
The KRM skyline, in three dimensions
The KRM mark is a skyline of five towers standing on the three letters of our name. Here it is modelled in polished silver: drag it to turn it and see it from every side.
KRM Global Contracting & Maintenance LLCكرم جلوبال للمقاولات والصيانة
About KRM GlobalTwo divisions, one company
Healthcare on one side. Everything else on the other.
Each division has its own team, processes and track record — and both draw on the same engineering department, design studio and workshops in Mussafah.
Healthcare Fit-Out
A department that works only on clinical projects: planned with the hospital, built under ICRA infection control, tested and handed over licensing-ready.
- Clean RoomsPharmacy, IVF, PCR and research, to ISO 14644
- Operating TheatresLaminar flow, HEPA, medical gases, pendants and IPS
- Patient Rooms & VIP SuitesInpatient wards, VIP and royal suites, paediatric rooms
- Robotic PharmacySite readiness and pre-installation for pharmacy robots
- Dialysis UnitsRO water plant, loop piping and station services
- Dental ClinicsDesigned and built to DoH clinic-licensing requirements
Commercial & Hospitality Fit-Out
Hotels, restaurants, offices, wedding halls, schools, gardens and car parks — with the aluminium and glass works and the furniture that complete them.
- Hotels & HospitalityGuest rooms, suites, lobbies, F&B and back-of-house
- Restaurants & CafésDining rooms, bars, cafés and commercial kitchens
- Offices & WorkplacesExecutive offices, headquarters floors and boardrooms
- Wedding Halls & MajlisMunicipal wedding halls, majlis and event venues
- Schools & EducationClassrooms, libraries, labs, fire & life safety and furniture
- Landscaping & OutdoorGardens, pools, pergolas, hardscape and irrigation
- Car Parking ShadesTensile, cantilever and louvred parking shades
- Aluminium & Glass WorksCurtain walls, windows, partitions and acoustic systems
- Furniture & FF&ECustom-made and imported European furniture
Commercial & Hospitality Fit-Out
Nine specialities, built by the same hands
Explore each sector — every page has an interactive 3D model of the space and the systems KRM builds into it.
- 01
Hotels & Hospitality
Guest rooms, suites, lobbies, F&B and back-of-house
- 02
Restaurants & Cafés
Dining rooms, bars, cafés and commercial kitchens
- 03
Offices & Workplaces
Executive offices, headquarters floors and boardrooms
- 04
Wedding Halls & Majlis
Municipal wedding halls, majlis and event venues
- 05
Schools & Education
Classrooms, libraries, labs, fire & life safety and furniture
- 06
Landscaping & Outdoor
Gardens, pools, pergolas, hardscape and irrigation
- 07
Car Parking Shades
Tensile, cantilever and louvred parking shades
- 08
Aluminium & Glass Works
Curtain walls, windows, partitions and acoustic systems
- 09
Furniture & FF&E
Custom-made and imported European furniture
A full engineering department
Engineers before the first wall, and after the last one
KRM is not a crew with a van. Behind every site team sits a complete engineering department — the same people on every project, whatever its size.
Health, safety and environment
An HSE officer on every project, risk assessments and method statements, permits to work, toolbox talks and ISO 45001 and ISO 14001 systems.
Design and engineering
Architects, interior designers, MEP engineers and 3D visualisers who take the brief to approved drawings — and prepare the authority submissions.
Estimation and quantity surveying
Estimators and quantity surveyors who price from the drawings, prepare bills of quantities and keep cost and variations under control during the works.
Procurement and imports
A procurement department that sources locally and imports directly from manufacturers — materials, systems and European furniture — with samples and submittals before ordering.
Planning and project management
Programmes, look-aheads and weekly progress reports with photographs, inspection records and cost status shared with the client.
Quality control and document control
Inspection requests before every closed ceiling, material inspections, test certificates, as-built drawings and a complete handover dossier.
Monitored, then maintained
We watch the work every week — and come back after handover
Fit-out is a sequence of hundreds of small decisions. KRM monitors the workflow from the first survey to the last snag, and keeps an in-house corrective team on call after the keys are handed over.
- 01
Survey and brief
Site survey, services tracing and a written brief with the client’s priorities, programme and budget.
- 02
Design, estimate, approve
Concept, 3D views and drawings; a priced bill of quantities; authority and landlord approvals.
- 03
Procure and fabricate
Samples and submittals approved, long-lead items ordered, joinery and aluminium made in our workshops.
- 04
Build and monitor
Daily supervision, HSE inspections, inspection requests, weekly progress reports with photographs and cost status.
- 05
Test, snag, hand over
Testing and commissioning, snagging with the client, deep cleaning, as-built drawings and the handover dossier.
- 06
Aftercare by our own team
Defects-liability visits and corrective works by KRM’s in-house maintenance team — not a subcontractor — with an optional annual maintenance contract.
Any size of project
A single room or a whole complex — the same team, the same standard
Some clients come to KRM with one executive office, a villa garden or a café kiosk. Others bring multi-building government contracts with hundreds of inspection requests. Both get an engineer, a programme, a weekly report and a team that answers the phone after handover.
One room, one garden, one shopfront
- A single executive office or boardroom
- A villa pergola, car shade or garden
- A café, kiosk or retail unit
- A clinic room or a dental surgery
- Replacement windows, doors or a shopfront
- A furniture package for a school or hotel floor
Multi-building contracts and live facilities
- Two municipal wedding halls in Al Dhafra for DMT through Asteco
- Fire and life-safety enhancement across two ADEK schools
- Hotel floors renovated in sequence while the hotel trades
- Headquarters floors for banks and government entities
- Façades, curtain walls and car parks for compounds and institutions
- Hospital departments delivered inside live facilities
Interactive 3D
Step inside a KRM operating theatre
Drag to look around and pinch to zoom, then tap a numbered point to see what each system does. Switch on the layers to watch filtered air sweep down from the laminar-flow ceiling and out through the low-level returns, or to see the walls, ducts, medical-gas pipework and power behind them.
Loads the interactive model (about 130 KB).
Illustrative model of a typical operating theatre, built from the systems KRM delivers. It is not a drawing of a specific project.
Filtered air flows down in a smooth, unidirectional stream over the operating table and carries particles away from the surgical site. HEPA filtration and positive pressure keep unfiltered air out of the room.
Theatre lights on ceiling-mounted arms, installed and connected by KRM and coordinated with the hospital's equipment supplier.
Surgical and anaesthesia pendants bring medical gases, electrical power and data down from the ceiling. Our biomedical engineer coordinates them with the supplier, and the pre-installation works are built to the supplier's specification.
Sealed antibacterial walls and ceilings with hygienic modular wall systems and stainless-steel fittings from KRM's own workshops, and lead lining where imaging is used.
Hermetic doors close the room tight so the pressure cascade holds between the theatre, the scrub area and the corridor.
Air leaves through return grilles near the floor, so clean air sweeps down over the table and out across the room. Pressure cascade, air changes and HEPA integrity are tested before handover.
Isolated power supply and UPS keep life-support equipment running through a fault, and medical-gas outlets are tested and certified. Electrical and gas test certificates go into the handover dossier.
Conductive flooring, stainless-steel scrub stations and integrated storage are part of the same contract, finished to the same hygienic standard.
Whether it is an operating theatre or a wedding hall, the standard is the same: engineer it properly, build it with our own hands, and stay responsible for it after handover.
Why clients choose KRM
Led by an engineer, delivered by a complete company
KRM was founded by a biomedical engineer who acts as Project Director on every major project. Behind him sits a complete organisation: project managers, site engineers, QA/QC, HSE, planning, estimation, procurement, document control and finance — the same people, on every job.
- 01
Two dedicated divisions
Healthcare, and commercial and hospitality — each with its own team, processes and track record.
- 02
Design in-house
Designed by the people who will build it, from brief to approved drawings and 3D views.
- 03
A full engineering department
HSE, estimation, procurement, planning and QA/QC on every project, large or small.
- 04
Our own workshops
Joinery, aluminium, glass and stainless steel made by KRM: quality and lead times under our control.
- 05
Monitored every week
Weekly reports with photographs, inspections and cost status — time, cost and change under control.
- 06
We stay after handover
Corrective works and maintenance by KRM’s own in-house team, not a subcontractor.
Track record
Facilities delivered across all seven Emirates
Clinical facilities for government, regulator and private hospital groups — and halls, schools, offices and hospitality spaces for municipalities, managing agents and corporates.
- 20+
Pharmacy clean rooms
USP <797> / <800> and ISO 14644
- Sheikh Khalifa Specialist, General, Fujairah and Ajman (MOPA)
- Burjeel Hospital, Burjeel Royal and Burjeel Medical City
- Medeor Abu Dhabi and Al Ain · LLH · LifeCare
- Madinat Zayed, Sila and Ghayathi (SEHA) · Ruwais Hospital (ADNOC)
- 15+
Operating theatres
Laminar flow, HEPA, HTM and ASHRAE
- Sheikh Khalifa Central Hospital (MOPA)
- Al Jalila Children’s · Aster · Prime
- Al Garhoud · Al Ahlia · Al Bustan · Al Raha
- Burjeel Royal, Day Care and Sharjah · Medeor · Adam Vital
- 2
Municipal wedding halls
Liwa City and Al Marfaa City, Al Dhafra Region
- DMT / Al Dhafra Region Municipality, managed by Asteco
- Civil, interiors, bespoke aluminium doors and glazing, joinery, MEP, external works
- Full government document control: submittals, IR / MIR, weekly reports
- 2
ADEK schools
Fire & life-safety enhancement, Abu Dhabi
- Al Erteqaa and Al Tafawoq schools for Asteco / Aldar
- Fire alarm, emergency lighting, firefighting, clean agent, passive protection
- Coordinated for Civil Defence inspection and handover
Our clients
Trusted by healthcare, government and corporate clients across the UAE
Also: Emirates Health Services, Retaj Medical Center, Department of Municipalities and Transport, Al Dhafra Region Municipality, Aldar, ADEK schools, Abu Dhabi Police GHQ, Ministry of Presidential Affairs and more.
Questions answered
Frequently asked questions
What does KRM Global do?
KRM Global Contracting & Maintenance LLC is an Abu Dhabi fit-out, MEP and civil contractor with two divisions: a Healthcare Fit-Out Department for hospitals, clinics and laboratories, and a Commercial & Hospitality Fit-Out division for hotels, restaurants, offices, wedding halls, schools, landscaping and car shades, including aluminium and glass works and furniture. It designs, builds, furnishes and maintains facilities across the UAE.
Where is KRM located and how can I contact the company?
The head office is Store 65 & 66, Plot 24A, As Subh 3 St, Musaffah West 5 (MW5), P.O. Box 113525, Abu Dhabi, United Arab Emirates. Office hours are Sunday to Thursday, 8:00 to 17:00, and Friday, 8:00 to 13:30. Call +971 2 666 7050, WhatsApp +971 52 916 6599 or email info@krm.ae.
Does KRM have its own engineering department?
Yes. A full engineering department covers HSE, design and 3D visualisation, estimation and quantity surveying, procurement, planning and project management, QA/QC and document control — the same team on every project, large or small.
Does KRM take small projects as well as large ones?
Yes. KRM delivers single offices, villa gardens, car shades, café kiosks and furniture packages with the same engineers, programme and weekly reporting as its multi-building government contracts, such as the two Al Dhafra wedding halls.
What happens after handover?
KRM monitors the workflow during the project with weekly reports and inspections, and after handover its own in-house maintenance team carries out defects-liability and corrective works — not a subcontractor — with an optional annual maintenance contract.
Does KRM make aluminium, glass and furniture itself?
Yes. KRM has its own aluminium and glass workshop for curtain walls, windows, doors, acoustic and glazed partitions and screens, and its own carpentry and joinery workshop for custom-made furniture. It also imports European furniture directly from manufacturers for hotels, offices and schools.
Is KRM certified?
Yes. KRM holds ISO 9001:2015 (quality), ISO 14001:2015 (environmental) and ISO 45001:2018 (occupational health and safety) certification, issued by Royal Impact Certification Ltd (RICL) on 20 July 2026 and valid until 19 July 2029. The trade licence number is CN-3696043.
Request a proposal
Have a facility to build, fit out, furnish or maintain?
Send us the drawings, a scope or just an idea. The CEO and the department head review every enquiry personally and reply within one working day with a clear proposal, programme and price.
Last updated












